“The community-organized carpooling tradition known as slugging will soon expand to one of Fairfax County’s busiest commuting corridors,” FFXnow reported. The I-66 Slugging Network plans a September launch with morning pickups at the Monument Drive garage in Fair Oaks and University Boulevard park and ride in Gainesville, plus drop-offs at Rosslyn, L’Enfant Plaza, Navy Yard, and Metro Center stations, allowing HOV-3 vehicles to use the express lanes toll-free.

Organizers will also run an I-66 Slugging Challenge starting Sept. 14, funded by the U.S. Department of Transportation, offering incentives and up to $1,000 in prizes to encourage participation as a free, sustainable option amid rising return-to-office commuting along the corridor.


“Scheduled lane closures for road work in the Fredericksburg, Northern Neck and Middle Peninsula areas, weather permitting,” the Virginia Department of Transportation reported for the week of July 26 through Aug. 1. Overnight milling and paving will close single and double lanes on I-95 northbound near Exit 143 (Aquia/Garrisonville) in Stafford County, with additional ramp closures and work on Routes 1, 3, 17 and local roads.

Stafford County drivers should expect nighttime single- and double-lane restrictions on I-95 beginning as early as 9 p.m., temporary ramp shutdowns at Exit 143, and alternating or single-lane work on Route 1, Route 610, Route 3 and secondary roads. Motorists are advised to check 511 Virginia for real-time updates and allow extra travel time.


A brand-new parking garage between Sentara Northern Virginia Medical Center and Wegmans in Woodbridge was sold as a win for transit riders and drivers. Two years later, it remains largely empty and nearly impossible to reach safely on foot or by bike.


As part of the ongoing Rappahannock Canal Trailway Improvement Project, the Canal Path will be temporarily closed Thursday, July 23, from Washington Avenue to U.S. Route 1, including Higgins Bridge on Dale Street, to allow crews to complete milling and paving after recent vegetation removal, the City of Fredericksburg announced. The work was rescheduled from the previously planned July 30-31 dates, and the detour will follow the same route used in earlier closures, with an extended path to Washington Avenue.

Crews expect to finish Thursday, though weather delays could push the closure into Friday, July 24. The temporary shutdown supports continued improvements aimed at enhancing safety and accessibility along the popular Fredericksburg trail.


On July 18 at about 10:53 p.m., a 36-year-old man identified as Michael Hall was riding eastbound on Old Bridge Road near Colby Drive when he lost control of his 2014 Yamaha YZF-R1 motorcycle while navigating a right curve. He crossed into the median, struck a metal sign and guardrail, and was transported to a hospital where he later died. Speed is believed to be a factor, according to police.

Earlier, on July 10 at 6:31 a.m., 78-year-old John Gregory Grace of Occoquan was struck by a 2020 Jeep Grand Cherokee while crossing the Gordon Boulevard entry and exit lanes at the Occoquan Commuter Lot at 1325 Old Bridge Road. Grace, who was not in a designated crosswalk, died from his injuries. The driver, Arlen Yessenia Vivas Perez, 42, of Woodbridge, remained at the scene and was later charged with disregarding a stop sign.


Other incidents include the strong-arm robbery of a 12-year-old boy’s e-bike in Woodbridge and multiple public intoxication arrests in Stafford, including one involving a felon with a firearm.

This daily police blotter summarizes notable incidents reported by local agencies.


Manassas officials will begin a 30-day warning period today at the intersection of Liberia Avenue and Wellington Road as part of the city’s photo red light enforcement program.

Traffic safety studies showed enough violations and crashes at the spot to add cameras there. The warning period runs through Aug. 16, after which active enforcement starts and citations can be issued. A Manassas City Police officer reviews every potential violation before any ticket goes out.


The City of Fredericksburg announced that construction is complete on safety and traffic flow enhancements at two key Route 1 intersections, at Fall Hill Avenue and at Hanson Avenue/Princess Anne Street. Improvements include new crosswalks with pedestrian signals, extended turn lanes, raised medians, and updated traffic signals, with all vehicle lanes now open.

The projects, which began in December 2024, enhance safety for drivers and pedestrians in the historic city along a major Northern Virginia corridor, with final cleanup underway and additional paving planned for 2027.


The project targets the segment of Fall Hill Avenue from Washington Avenue/Germanna Street to the Mary Washington Boulevard roundabout. Improvements focus on pedestrian safety, traffic operations, and access management.

If funded, the project would require no local match. The application deadline is August 3, 2026, with funding decisions expected around March 2027. Construction is anticipated three to four years after funding.


VDOT Fredericksburg District Weekly Travel Alert reported. On I-95 Northbound at Exit 143 (Aquia/Garrisonville) in Stafford County, milling and paving work will occur Monday–Friday from 9 p.m.–4:30 a.m. with single and double lane closures between mile markers 142-145.

Multiple projects are also scheduled on Route 1, Fall Hill Avenue, Princess Anne Street in the City of Fredericksburg, and various Stafford County routes including Route 17, Route 606, Route 610, Route 627, Route 652, Route 709, Route 751, and Route 1264, involving guardrail work, paving, median improvements, and resurfacing with flagging and alternating lane closures.


View More Stories