This past weekend, a surge in electricity demand across the Mid-Atlantic region prompted a change at an area wastewater plant.
The electrical grid that serves the east coast, PJM Interconnection, was overloaded with demand when temperatures plummeted to the single digits at 4:20 a.m. Christmas Eve.