
Stafford County
- Route 1 Northbound and Southbound
- Lane Closures: Monday–Friday, 9 a.m.–3 p.m.
- Location: Between South Campus Boulevard and Spring Valley Drive.
- Purpose: Fiber installation under permit.
- Route 3 (Kings Highway)
- Lane Closures: Sunday–Thursday, 9 p.m.–6 a.m.
- Location: Bridge over railroad tracks between Cool Springs Road and Chatham Heights Road.
- Purpose: Bridge repairs.
- Route 17 Southbound
- Lane Closures: Monday–Friday, 9 a.m.–3 p.m.
- Location: Between Village Parkway and Hartwood Church Road.
- Purpose: Waterline and sewer line installation under permit.
- Route 17 Northbound
- Lane Closures: Monday–Friday, 9 a.m.–3 p.m.
- Location: Between Poplar Road and Hartwood Church Road.
- Purpose: Fiber installation under permit.
- Berea Church Road
- Closure: From Berea Knolls Drive to Theresa Garden Place.
- Purpose: Road improvements for a Stafford County project.
Spotsylvania County
- Route 1
- Lane Alignment Shift: Monday–Friday, 9 a.m.–3 p.m.
- Location: Between Arcadia Road and Mudd Tavern Road.
- Purpose: Road improvement connected to the Kalahari Resorts development.
- Route 620 (Harrison Road)
- Lane Closures: Monday–Friday, 9 a.m.–3 p.m.
- Location: Between Kingswood Boulevard and Salem Church Road.
- Purpose: Water main installation under permit.
- I-95 Southbound Exit 126 Off-Ramp
- Lane Closures: Sunday–Saturday, 7 p.m.–10 a.m.
- Location: Off-ramp to Route 1.
- Purpose: Construction to widen the ramp and add a right turn lane.
- Spotsylvania Parkway
- Lane Closures: Monday–Friday, 9 a.m.–3:30 p.m.
- Location: At intersections with Deep Creek Drive/New Berne Road and Holley Oak/Yellow Brinch Drive.
- Purpose: Pedestrian signal installation.
Fredericksburg
- Route 1 Business (Lafayette Boulevard)
- Lane Closures: Monday–Thursday, 7 a.m.–2 p.m.; Friday, 7 a.m.–Noon.
- Location: Between Twin Lake Drive and St. Paul Street.
- Purpose: Construction of a shared-use path.
- Route 1 Intersection Improvements
- Locations: Fall Hill Avenue, Princess Anne Street, and Hanson Avenue.
- Purpose: Long-term improvements with completion by June 2026.
- Route 1 over Rappahannock River (Falmouth Bridge)
- Northbound Lane Closure: Ongoing.
- Purpose: Emergency bridge repairs
Stay informed about traffic impacts by checking 511.VDOT.Virginia.Gov. For ridesharing options, visit GWRideConnect or call (540) 373-7665.