WOODBRIDGE — Beginning this month, motorists in the Woodbridge area may start to see the dreaded orange traffic cones slowing things down as construction crews begin to relocate utilities for the widening of Route 1 from Mary’s Way to Featherstone Road.

This 1.3-mile section of Route 1 will go from being a four-lane undivided highway to a six-lane divided highway.  Work will include the construction of a 1 0-foot-wide multi-modal trail and a 5-foot-wide sidewalk along the sides of the route.


NORTH STAFFORD — The heavy equipment is now in place in Park Ridge, the North Stafford neighborhood where a massive sinkhole formed last week. 

As of Sunday, water had been drained from the base of the hole located at the intersection of Eustace Road and Legal Court. 


WOODBRIDGE — For commuters in Woodbridge heading to the Pentagon and beyond, there’s carpooling, rail and single-occupancy vehicles going up congested Interstate 95.

But to Woodbridge District Supervisor Frank Principi there’s another choice, and that’s the high-speed ferry up the Potomac River.


View More Stories