FREDERICKSBURG — Starting Monday, July 22, crews will begin major construction work on the I-95 Express Lanes Fredericksburg Extension – also known as Fred Ex.
Drivers may encounter crews and construction equipment in the median and along the shoulders, as well as trucks entering or exiting the median at various construction entrances throughout the work zone, between Exit 148 (Russell Road) and Exit 133 (Route 17) in Stafford County.
Daytime and overnight lane and shoulder closures are expected in the work zone.
Crews will begin installing construction signage, entrances, and barriers the week of July 22.
Weather permitting, the work zone will occur at the following times:
- Northbound lanes: Monday through Friday, 9 p.m. to 4:30 a.m.
- Southbound lanes: Monday through Friday, 9 p.m. to 10 a.m.
- Monday through Friday, 8 a.m. to 5 p.m. – short term shoulder closures
Clearing, erosion, and sediment control work will begin once traffic barriers have been set.
Weather permitting, work will occur at the following times:
- Monday through Friday, 7 a.m. to 5 p.m.
The Fred Ex project will extend the I-95 Express Lanes about 10 miles south of Route 610 (Garrisonville Road) in Stafford to Route 17 (I-95 Exit 133).
Project features include:
- Two reversible high-occupancy toll lanes will be built in the existing median of I-95, which will connect to the I-95 southbound Rappahannock River Crossing project and the I-95 northbound Rappahannock River Crossing project
- Additional access to the I-95 Express Lanes will be added near the Route 17 and Route 630 (Courthouse Road) I-95 interchanges in Stafford, and near the Russell Road interchange at Quantico Marine Corps Base in Prince William County
The extended Express Lanes are anticipated to open to traffic in October 2022. All work related to the project is scheduled to be completed in 2023.
Drivers are encouraged to limit distractions and give the road ahead their full attention while traveling in the work zone.
As of July 1, Virginia law now states that it is unlawful for any person to hold a handheld personal communications device while driving a moving motor vehicle in a highway work zone.
Transurban is managing the construction and will operate the Fredericksburg Extension as part of the 95 Express Lanes upon completion of the project.
The design-build contractor is a joint venture between Branch Civil and Flatiron.
Photo: P3 Virginia
Recent Stories

The most anticipated night of the year is almost here! This Saturday, May 31, step into the romance, elegance, and charm of Paris—without ever leaving Washington, DC.
Join us for An Evening in Paris, an unforgettable soirée celebrating the best of French culture. Experience an immersive evening filled with gourmet French cuisine, refined wines, captivating live music, and the irresistible ambiance of the City of Light. Whether you’re a lifelong Francophile or simply love a night of sophistication, this is a celebration you won’t want to miss.
✨ Highlights of the evening include:

Calling all WSHS Class of 1975 graduates! Our class has planned our 50-Year Class Reunion to be held September 26-28, 2025 in Woodbridge, Virginia. Reunion details and registration information are available to be sent to you.
To find out more, please email our reunion committee at [email protected]
Your Weight Matters National Convention
Hosted by the Obesity Action Coalition (OAC) since 2012, this highly-anticipated gathering is the nation’s leading gathering focused on empowering individuals with science-based education, support and practical tools for managing weight and improving health.
This unique Convention truly has something
Van Metre 5K Run
Participate in the 33rd Annual Van Metre 5K Run—a race that goes further than 3.1 miles, where every stride you take supports Children’s National Hospital. The Van Metre 5K Run donates 100% of proceeds to Children’s National Hospital and has