On Thursday, March 11, the Virginia Department of Transportation (VDOT) will shift all traffic on Route 17 southbound at the bridge over Dragon Run to the left travel lane so that construction can continue to improve the bridge.
After Route 17 southbound traffic is shifted to the left travel lane, the right travel lane will become a permanent 24-hour single lane closure until the project is complete in Aug. 2021.