Update Feb. 2
The I-95 South lane closures on the Dale Boulevard collector/distributor lanes scheduled for tonight has been RESCHEDULED for tomorrow night (Tuesday, Feb. 3) due to the high winds being forecast tonight. The 9:00 PM to 5:00 AM time frame still applies, as does everything else in the release below that was sent out Friday.
-Email from VDOT to Potomac Local
Original post Jan. 30
Both of the southbound I-95 collector/distributor lanes for Dale Boulevard (Exit 156) will intermittently close between 9:00 p.m. Monday, February 2 and 5:00 AM Tuesday, February 3. Each closure will last up to 15 minutes.
During the full closures, southbound I-95 motorists will not be able to access westbound or eastbound Dale Boulevard/Route 784. However, motorists on Dale Boulevard will still be able to access southbound I-95.
There will also be single lane closures in the collector-distributor lanes between 9 p.m. and 5 a.m. The southbound I-95 through lanes will not be impacted by the work and will remain open.
Message signs will be posted in advance of the work so that motorists can use alternate routes.
The closures are needed in order to replace overhead sign structures.
Updated: Lane closures on I-95 at Dale City rescheduled
|
